TORONTO, May 6, 2014 /CNW/ - IAMGOLD Corporation ("IAMGOLD" or the "Company") today reported its unaudited condensed
consolidated interim financial and operating results for the first
quarter ended March 31, 2014.
"Production is on track for the year with Essakane ramping up production
following the commissioning of the new hard rock processing line and
Westwood gearing up for commercial production in the third quarter,"
said
Steve Letwin
, President and Chief Executive Officer. "We produced
172,000 ounces of gold in the quarter. To achieve better economies of
scale, ore mined at Mouska and Westwood in the first quarter, with an
estimated 20,000 contained ounces of gold, was stockpiled for
processing beginning in the second quarter 2014 when there will be a
higher volume of ore available.
"In the first quarter, we reduced all-in sustaining costs by $92 an
ounce from the same quarter last year, building on the sustainable cost
savings carried forward from our 2013 program," continued Mr. Letwin.
"Cost reduction and efficiency improvements continue to be priorities
at all our mine sites, as does safety. We demonstrated this commitment
to safety with a 46% improvement from the first quarter 2013, achieving
the highest score ever recorded for our leading safety measure."
-
Adjusted net earnings attributable to equity holders1 of $12.2 million, or $0.03 per share1.
-
Net cash from operating activities before changes in working capital1 of $64.6 million, or $0.17 per share1.
-
Cash, cash equivalent, gold bullion (at market value) of $313.9 million
at March 31, 2014.
-
Attributable gold production of 172,000 ounces2; attributable gold sales of 176,000 ounces.
-
Stockpiled ore mined at Mouska and Westwood, with an estimated 20,000
contained ounces, will be processed beginning in the second quarter
2014.
-
Total cash costs1,3 - gold mines4 of $886 per ounce produced.
-
Total cash costs for IAMGOLD owned and operated mines of $842 per ounce
produced.
-
All-in sustaining costs1 - gold mines of $1,198 per ounce sold.
-
Continued focus on further cost reduction and sustaining savings from
the 2013 cost reduction program.
-
Maintaining 2014 production and cost guidance.
-
Successful commissioning of the new processing line at Essakane.
-
Rosebel enters into five-year option agreement with Sarafina N.V. to
target higher-grade, softer rock on a 10,000 hectare mining concession
surrounding the Rosebel mine.
-
Subsequent to quarter-end, declared maiden resource estimate for the
Pitangui Project in Brazil comprising a 638,000 ounce inferred resource
grading 4.88 grams of gold per tonne.
SUMMARY OF FINANCIAL AND OPERATING RESULTS
|
|
|
|
|
|
|
|
|
|
|
Three months ended March 31,
|
|
|
2014
|
|
2013
|
|
Financial Results ($ millions, except where noted)
|
|
|
|
|
|
|
|
|
Revenues
|
|
$
|
279.3
|
|
|
$
|
305.3
|
|
Cost of sales
|
|
$
|
224.3
|
|
|
$
|
184.4
|
|
Earnings from mining operations1
|
|
$
|
55.0
|
|
|
$
|
120.9
|
|
Net earnings attributable to equity holders of IAMGOLD
|
|
$
|
3.7
|
|
|
$
|
10.9
|
|
Net earnings per share ($/share)
|
|
$
|
0.01
|
|
|
$
|
0.03
|
|
Adjusted net earnings attributable to equity holders of IAMGOLD1
|
|
$
|
12.2
|
|
|
$
|
57.7
|
|
Adjusted net earnings per share1 ($/share)
|
|
$
|
0.03
|
|
|
$
|
0.15
|
|
Net cash from operating activities
|
|
$
|
28.1
|
|
|
$
|
99.5
|
|
Net cash from operating activities before changes in working capital1
|
|
$
|
64.6
|
|
|
$
|
115.2
|
|
Net cash from operating activities before changes in working capital
($/share)1
|
|
$
|
0.17
|
|
|
$
|
0.31
|
|
Key Operating Statistics
|
|
|
|
|
|
|
|
|
Gold sales - attributable (000s oz)
|
|
|
176
|
|
|
|
171
|
|
Gold commercial production - attributable (000s oz)
|
|
|
171
|
|
|
|
188
|
|
Gold production - attributable2 (000s oz)
|
|
|
172
|
|
|
|
188
|
|
Average realized gold price1 ($/oz)
|
|
$
|
1,286
|
|
|
$
|
1,631
|
|
Total cash costs1,3,4 - gold mines6 ($/oz)
|
|
$
|
886
|
|
|
$
|
787
|
|
Gold margin1 ($/oz)
|
|
$
|
400
|
|
|
$
|
844
|
|
All-in sustaining costs1,5 - gold mines ($/oz)
|
|
$
|
1,198
|
|
|
$
|
1,290
|
|
All-in sustaining costs - total7 ($/oz)
|
|
$
|
1,038
|
|
|
$
|
1,223
|
|
Niobium production (millions of kg Nb)
|
|
|
1.3
|
|
|
|
1.2
|
|
Niobium sales (millions of kg Nb)
|
|
|
1.5
|
|
|
|
1.2
|
|
Operating margin1 ($/kg Nb)
|
|
$
|
20
|
|
|
$
|
16
|
|
1
|
This is a non-GAAP measure. Refer to the non-GAAP performance measures
section of the MD&A for the reconciliation to GAAP.
|
|
2
|
2014 balance includes Westwood pre-commercial production for the three
months ended March 31, 2014 of 1,000 ounces.
|
|
3
|
The total cash costs computation does not include Westwood
pre-commercial production for the three months ended March 31, 2014 of
1,000 ounces.
|
|
4
|
By-product credits are included in the calculation of total cash costs.
Excluding these credits increases total cash costs - gold mines by $1
and $2 per ounce for the three months ended March 31, 2014 and 2013,
respectively.
|
|
5
|
By-product credits are included in the calculation of all-in sustaining
costs - gold mines. Refer to non-GAAP performance measures section of
the MD&A for the reconciliation to GAAP.
|
|
6
|
Gold mines, as used with total cash costs and all-in sustaining costs,
consist of Rosebel, Essakane, Mouska, Sadiola and Yatela on an
attributable basis.
|
|
7
|
Total, as used with all-in sustaining costs, includes the impact of
niobium contribution, defined as the Niobec mine's operating margin and
sustaining capital, on a per gold ounce sold basis. Refer to the all-in
sustaining costs table in the MD&A.
|
FIRST QUARTER 2014 HIGHLIGHTS
Financial Performance
-
Revenues for the first quarter 2014 were $279.3 million, $26.0 million
lower than the same prior year period. The decrease was mainly due to a
lower average realized gold price ($55.7 million), partially offset by
higher gold sales volume, which excludes joint ventures, of 12,000
ounces ($17.4 million) and higher niobium sales volume ($12.3 million).
-
Cost of sales for the first quarter 2014 was $224.3 million, up $39.9
million from the same prior year period. The increase was the result of
higher operating costs ($37.4 million) and higher depreciation expense
($7.0 million), partially offset by lower royalties due to a lower
realized gold price ($4.5 million). Operating costs were higher
primarily due to an increase in total material mined and a greater
proportion of hard rock at Rosebel and Essakane.
-
Reported net earnings attributable to equity holders for the first
quarter 2014 were $3.7 million ($0.01 per share), $7.2 million lower
than the first quarter 2013. The decrease was mainly related to the
combined impact of lower revenues and higher cost of sales ($65.9
million) and higher net losses from investments in associates and joint
ventures ($13.9 million), partially offset by the net reversal of
marketable securities and associates impairment charges ($30.5
million), lower income taxes ($21.9 million), lower exploration
expenses ($13.0 million) and lower derivative losses ($4.2 million).
-
Adjusted net earnings attributable to equity holders1 for the first quarter 2014 were $12.2 million ($0.03 per share1), $45.5 million ($0.12 per share) lower than the same prior year
period.
-
Net cash from operating activities for the first quarter 2014 was $28.1
million, down $71.4 million from the same prior year period. The
decrease was mainly due to lower earnings from operations and higher
movements in changes in non-cash working capital items.
-
Net cash from operating activities before changes in working capital1 for the first quarter 2014 was $64.6 million ($0.17 per share1), $50.6 million ($0.14 per share) lower than the same prior year
period.
Financial Position
-
Cash, cash equivalents and gold bullion (at market value) was $313.9
million as at March 31, 2014, down $70.7 million from December 31,
2013. The decrease was mainly due to capital expenditures ($100.2
million), partially offset by net cash from operating activities ($28.1
million).
-
As at March 31, 2014, no funds were drawn against our $750 million total
unsecured revolving credit facilities.
Production, Costs and Margins
Gold Operations
-
Attributable gold production, inclusive of joint venture operations, was
172,000 ounces in the first quarter 2014, down 16,000 ounces from the
same prior year period. The decrease was primarily due to lower grades
at Rosebel related to pit sequencing (9,000 ounces), stockpiling of ore
at Mouska for batch processing beginning in the second quarter 2014
(5,000 ounces), and lower production at Yatela (6,000 ounces) following
the suspension of mining activities in the third quarter 2013.
Partially offsetting was an increase in production at Essakane (3,000
ounces) attributed to the commissioning of the new processing line to
process a higher proportion of hard rock and a nominal amount of
pre-commercial production at Westwood (1,000 ounces).
-
To achieve economies of scale, ore mined from both Mouska and Westwood,
with an estimated 20,000 contained ounces of gold, was stockpiled for
batch processing beginning in the second quarter 2014 when a larger
quantity of ore is expected to be available. Approximately 7,000 of
these contained ounces are from Westwood. Combined production from
Mouska and Westwood in 2014 is expected to range between 100,000 and
120,000 ounces.
-
Attributable gold sales, inclusive of joint venture operations, for the
first quarter 2014 were 176,000 ounces compared to attributable gold
commercial production of 171,000 ounces. The variance of 5,000 ounces
mainly related to timing of sales at Rosebel where inventory from 2013
was sold in the first quarter 2014.
-
Total cash costs1,3 - gold mines4 for the first quarter 2014 were $886 per ounce produced, up 13% from
the same prior year period. The increase was mainly due to the impact
of lower grades and the increase in the processing of hard rock
together with inflationary cost pressures across all sites. This was
partially offset by the sustained benefits from our 2013 cost reduction
program.
-
All-in sustaining costs1 - gold mines for the first quarter of 2014 were $1,198 per ounce sold,
down 7% from the first quarter 2013. The decrease is mainly due to
lower sustaining capital expenditures at Rosebel and Essakane,
partially offset by higher total cash costs. Sustaining capital
expenditures were higher in the same prior year period due to
significant spending on mining equipment at Rosebel.
-
All-in sustaining costs - total4 for the first quarter 2014 were $1,038 per ounce sold, down 15% from
the same prior year period. This measure includes the impact of the
Niobec mine's operating margin1 and its sustaining capital expenditures.
Niobium Operation
-
Niobium production for the first quarter 2014 was 1.3 million kilograms,
up 8% from the same quarter in 2013.
-
The operating margin1 increased by 25% to $20 per kilogram in the first quarter 2014 from $16
per kilogram in the same quarter 2013. The increase in the operating
margin reflects sustainable cost savings resulting from the cost
reduction initiatives in 2013, improvement in recoveries related to
efforts to optimize mill performance, and a stronger U.S. dollar
compared to the Canadian dollar.
Commitment to Zero Harm Continues
Regarding health and safety, the frequency of all types of serious
injuries (measured as DART rate6) for the first quarter 2014 was 0.52 compared to 0.96 for first quarter
2013, representing a 46% improvement. This is the best score ever
recorded by IAMGOLD and reflects a heightened emphasis on safety in a
time of cost constraint. In further recognition of our commitment to
corporate social responsibility IAMGOLD has been recognized as one of
the 50 Most Socially Responsible Corporations in Canada on the 2014 Maclean's/L'actualité/Sustainalytics list.
ATTRIBUTABLE GOLD PRODUCTION AND ALL-IN SUSTAINING AND TOTAL CASH COSTS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Gold Production (000s oz)
|
|
Total Cash Costs1,3
($ per gold ounce produced)
|
|
All-in Sustaining Costs1
($ per gold ounce sold)
|
|
Three months ended March 31,
|
|
2014
|
|
2013
|
|
2014
|
|
2013
|
|
2014
|
|
2013
|
|
Owner-operator
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rosebel (95%)
|
|
|
80
|
|
|
89
|
|
$
|
813
|
|
$
|
717
|
|
$
|
1,031
|
|
$
|
1,157
|
|
Essakane (90%)
|
|
|
68
|
|
|
65
|
|
|
875
|
|
|
729
|
|
|
1,233
|
|
|
1,188
|
|
Doyon division2 (100%)
|
|
|
-
|
|
|
5
|
|
|
-
|
|
|
988
|
|
|
969
|
|
|
-
|
|
|
|
|
148
|
|
|
159
|
|
|
842
|
|
|
731
|
|
|
1,185
|
|
|
1,259
|
|
Joint ventures
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sadiola (41%)
|
|
|
19
|
|
|
19
|
|
|
1,106
|
|
|
1,043
|
|
|
1,170
|
|
|
1,387
|
|
Yatela (40%)
|
|
|
4
|
|
|
10
|
|
|
1,551
|
|
|
1,196
|
|
|
1,885
|
|
|
1,565
|
|
|
|
|
23
|
|
|
29
|
|
|
1,175
|
|
|
1,094
|
|
|
1,291
|
|
|
1,450
|
|
Total commercial operations
|
|
|
171
|
|
|
188
|
|
|
886
|
|
|
787
|
|
|
1,198
|
|
|
1,290
|
|
Doyon division2 (100%)
|
|
|
1
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
|
|
172
|
|
|
188
|
|
|
886
|
|
|
787
|
|
|
1,198
|
|
|
1,290
|
|
Cash costs1, excluding royalties
|
|
|
|
|
|
|
|
|
820
|
|
|
699
|
|
|
|
|
|
|
|
Royalties
|
|
|
|
|
|
|
|
|
66
|
|
|
88
|
|
|
|
|
|
|
|
Total cash costs3
|
|
|
|
|
|
|
|
|
$ 886
|
|
|
$ 787
|
|
|
|
|
|
|
|
All-in sustaining costs - gold mines4,6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1,198
|
|
|
1,290
|
|
Niobium contribution5
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(160)
|
|
|
(67)
|
|
All-in sustaining costs - total6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$
|
1,038
|
|
$
|
1,223
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1
|
This is a non-GAAP measure. Refer to the non-GAAP performance measures
section of the MD&A for the reconciliation to GAAP.
|
|
2
|
During the first quarter of 2014, the Westwood mill was effectively shut
down, except for some milling activity required for backfill operations
at Westwood; however, Mouska sold 4,000 ounces from 2013 production. In
the first quarter of 2013, Mouska had production of 5,000 ounces and no
sales. While the ore from Mouska is commercial production, the ore from
Westwood is at pre-commercial levels.
|
|
3
|
The total cash costs computation does not include Westwood
pre-commercial production for the three months ended March 31, 2014 of
1,000 ounces.
|
|
4
|
Gold mines, as used with total cash costs and all-in sustaining costs,
consist of Rosebel, Essakane, Mouska, Sadiola and Yatela on an
attributable basis.
|
|
5
|
Niobium contribution consists of Niobec mine's operating margin and
sustaining capital on a per gold ounce sold basis.
|
|
6
|
By-product credits are included in the calculation of this measure;
refer to the non-GAAP performance measures section of the MD&A for the
reconciliation to GAAP.
|
FIRST QUARTER 2014 OPERATING HIGHLIGHTS
(Refer to the MD&A for further details and analyses about our
operations.)
Rosebel Mine - Suriname
Rosebel produced 80,000 attributable ounces of gold in the first quarter
2014, which was 10% lower than that produced in the same quarter 2013.
The variance was mainly due to lower grades, partially offset by an
increase in mining and processing productivity despite the increase in
the proportion of hard rock from 19% to 27%. An expanded mining fleet
was behind the 25% increase in total material mined, and a 9% increase
in mill throughput reflects the benefit of the additional grinding
capacity from the installation of the third ball mill completed in the
second quarter 2013.
Grades in the first quarter 2014 have recovered 14% from the fourth
quarter 2013, but are still lower than they were in the same prior year
period. To reduce this grade variation in the future, we completed an
independent diagnostic review and have identified opportunities, some
of which have been implemented, to improve grades going forward. This
was the main factor behind a 14% increase in production from the fourth
quarter 2013.
Total cash costs in the first quarter 2014 were higher than the same
period in 2013 mainly due to the increased costs associated with
processing harder rock and the longer haul distances from the pits to
the mill. The lower power rates resulting from the new power rate
agreement in 2013 helped to mitigate the cost increases and the
operation is on track for completing the solar project in the third
quarter 2014.
Respecting Rosebel's joint venture agreement with the Government of
Suriname, we made progress towards acquiring additional properties with
the potential for higher grade, softer rock and lower stripping ratios.
On March 6th, 2014, we announced a five-year option agreement with Sarafina N.V. to
explore a 10,000 hectare mining concession 25 kilometres from the
Rosebel mine. Data compiled from earlier exploration work is being
reviewed with the objective of identifying specific drill targets on
the property. Discussions continue with a view to executing similar
transactions for other prospective properties.
Essakane Mine - Burkina Faso
First quarter attributable gold production of 68,000 ounces was up 5%
from the same quarter 2013. The commissioning of the new processing
line has increased the capacity for feeding a higher proportion of hard
rock through the mill. The mill processed 25% hard rock in the first
quarter 2014 compared to 8% in the same prior year period.
Throughput was up 11% from the previous quarter, which in turn drove
production up 15% from the fourth quarter 2013. Continued efforts to
optimize the efficiency of the mill combined with the secondary crusher
scheduled to come on stream in the second quarter is expected to drive
production to a higher level in the second half of the year. We expect
an improvement in grades as the current production phase of the pit
accesses the heart of the deposit comprising high-grade hard rock. With
the production ramp up in the second half, we expect total ounces in
2014 to be approximately 25% higher than 2013 production.
Total cash costs in the first quarter 2014 were higher than the same
quarter 2013 due to lower grades, a reduction in the capitalization of
stripping costs and higher energy costs associated with hard rock
processing. The expectation of higher grades will help to mitigate the
impact of the higher energy consumption required to treat harder ore.
At the same time, we are preparing studies to assess both solar power
and connection to the national power grid in Ouagadougou. These
projects would lead to a significant reduction in power costs and would
help to extend the life of the mine.
Doyon Division (Westwood Mine and Mouska Mine) - Canada
At Westwood, the focus for the first half of the year continues to be on
underground development and productivity improvements as the mine
progresses towards commercial production in the third quarter 2014.
While the mine closure at Mouska was scheduled for the end of the first
quarter, mining continued in the second quarter and was completed in
April. Closure activities will continue for the remainder of the year.
To achieve better economies of scale, ore mined at the Doyon division in
the first quarter 2014, estimated to have 20,000 contained ounces of
gold, was stockpiled for batch processing beginning in the second
quarter 2014 when larger quantities of ore are expected to be
available. However, a nominal amount of ore was processed from Westwood
to provide Mouska with mill tailings, which are a primary constituent
of the paste backfill used in the mining process at Mouska. This
resulted in pre-commercial production of 1,000 ounces in the first
quarter 2014.
Sadiola Mine - Mali
First quarter attributable gold production of 19,000 ounces was flat
with the first quarter 2013.
As stated previously, we will not proceed with the Sadiola Sulphide
Project on our own. We are working with our partner AngloGold Ashanti
to finalize the strategy, with a focus on determining the economic
model that will generate the most attractive returns.
Niobec - Canada
Niobec produced 1.3 million kilograms of niobium in the first quarter,
up 8% from the same quarter 2013. The operating margin1 increased by 25% to $20 per kilogram due to sustainable cost savings
resulting from the cost reduction initiatives in 2013, improvement in
recoveries related to efforts to optimize mill performance, and a
stronger U.S. dollar compared to the Canadian dollar.
EXPLORATION
In the first quarter 2014, expenditures for exploration and project
studies totaled $14.0 million, of which $9.1 million was expensed and
$4.9 million capitalized. This compares to $28.8 million for the same
period in 2013. Greenfield exploration campaigns continued on priority
projects in Brazil, Senegal and Quebec, along with resource development
drilling programs at Rosebel and Essakane.
Subsequent to the end of the first quarter, we announced on April 9th 2014 a maiden resource estimate for our Pitangui Project in Brazil. The
mineral resource estimate for the São Sebastião gold deposit comprises
a 4.1 million tonne inferred resource grading 4.88 grams of gold per
tonne for 638,000 contained ounces. The resource estimate incorporates
assay results from 57 drill holes totaling 19,600 metres and is based
on an underground mine scenario. To date, mineralization has been
outlined for approximately 1,400 metres along strike. With deposits of
this nature typically comprising multiple mineralized shoots, our
ongoing delineation drilling program is focused on expanding the
resource.
In 2013, we declared a maiden resource estimate for our Boto Gold
Project in Senegal that outlined a 1.1 million ounce indicated resource
averaging 1.6 grams of gold per tonne. On April 9th 2014, we announced that assay results from a further 9,400 metres of
drilling confirmed the continuity of the defined resources, and more
importantly extended mineralization associated with the largest deposit
on the property by a further 300 metres.
With respect to our Côté Gold project, which remains an attractive asset
for our longer-term production portfolio, we anticipate the feasibility
study to be completed by the first quarter 2016.
End Notes (excluding tables)
|
(1)
|
This is a non-GAAP measure. Refer to the reconciliation in the non-GAAP
performance measures section of the MD&A.
|
|
(2)
|
Attributable gold production includes Westwood pre-commercial production
for the three months ended March 31, 2014 of 1,000 ounces.
|
|
(3)
|
The total cash costs computation does not include Westwood
pre-commercial production for the three months ended March 31, 2014 of
1,000 ounces.
|
|
(4)
|
Gold mines, as used with total cash costs and all-in sustaining costs,
consist of Rosebel, Essakane, Mouska, Sadiola and Yatela on an
attributable basis.
|
|
(5)
|
Total, as used with all-in sustaining costs, includes the impact of
niobium contribution, defined as the Niobec mine's operating margin and
sustaining capital, on a per gold ounce sold basis. Refer to the all-in
sustaining cost table in the MD&A.
|
|
(6)
|
The DART refers to the number of days away, restricted duty or job
transfer incidents that occur per 100 employees.
|
|
|
|
CONFERENCE CALL
A conference call will be held on Wednesday, May 7th, 2014 at 8:30 a.m. (Eastern Standard Time) for a discussion with
management regarding IAMGOLD`s first quarter 2014 operating performance
and financial results. A webcast of the conference call will be
available through IAMGOLD`s website - www.iamgold.com.
Conference Call Information: North America Toll-Free: 1-800-319-4610 or
1-604-638-5340.
A replay of this conference call will be available from 11:00 a.m. May 7th to June 6th, 2014. Access this replay by dialling: North America toll-free:
1-800-319-6413 or 1-604-638-9010, passcode: 1952#.
CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION
All information included in this news release, including any information
as to the Company's future financial or operating performance, and
other statements that express management's expectations or estimates of
future performance, other than statements of historical fact,
constitute forward looking information or forward-looking statements
and are based on expectations, estimates and projections as of the date
of this news release. For example, forward-looking statements contained
in this news release are found under, but are not limited to being
included under, the headings "First Quarter 2014 Highlights" and "First
Quarter 2014 Operating Highlights", and include, without limitation,
statements with respect to: the Company's guidance for production,
total cash costs, all-in sustaining costs, depreciation expense,
effective tax rate, niobium production and operating margin, capital
expenditures, operations outlook, cost management initiatives,
development and expansion projects, exploration, the future price of
gold, the estimation of mineral reserves and mineral resources, the
realization of mineral reserve and mineral resource estimates, the
timing and amount of estimated future production, costs of production,
permitting timelines, currency fluctuations, requirements for
additional capital, government regulation of mining operations,
environmental risks, unanticipated reclamation expenses, title disputes
or claims and limitations on insurance coverage. Forward-looking
statements are provided for the purpose of providing information about
management's current expectations and plans relating to the future.
Forward-looking statements are generally identifiable by, but are not
limited to the, use of the words "may", "will", "should", "continue",
"expect", "anticipate", "estimate", "believe", "intend", "plan", "suggest", "guidance", "outlook", "potential", "prospects", "seek",
"targets", "strategy" or "project" or the negative of these words or
other variations on these words or comparable terminology.
Forward-looking statements are necessarily based upon a number of
estimates and assumptions that, while considered reasonable by
management, are inherently subject to significant business, economic
and competitive uncertainties and contingencies. The Company cautions
the reader that reliance on such forward-looking statements involve
risks, uncertainties and other factors that may cause the actual
financial results, performance or achievements of IAMGOLD to be
materially different from the Company's estimated future results,
performance or achievements expressed or implied by those
forward-looking statements, and the forward-looking statements are not
guarantees of future performance. These risks, uncertainties and other
factors include, but are not limited to, changes in the global prices
for gold, niobium, copper, silver or certain other commodities (such as
diesel, aluminum and electricity); changes in U.S. dollar and other
currency exchange rates, interest rates or gold lease rates; risks
arising from holding derivative instruments; the level of liquidity and
capital resources; access to capital markets, and financing; mining tax
regimes; ability to successfully integrate acquired assets;
legislative, political or economic developments in the jurisdictions in
which the Company carries on business; operating or technical
difficulties in connection with mining or development activities; laws
and regulations governing the protection of the environment; employee
relations; availability and increasing costs associated with mining
inputs and labour; the speculative nature of exploration and
development, including the risks of diminishing quantities or grades of
reserves; adverse changes in the Company's credit rating; contests over
title to properties, particularly title to undeveloped properties; and
the risks involved in the exploration, development and mining business.
With respect to development projects, IAMGOLD's ability to sustain or
increase its present levels of gold production is dependent in part on
the success of its projects. Risks and unknowns inherent in all
projects include the inaccuracy of estimated reserves and resources,
metallurgical recoveries, capital and operating costs of such projects,
and the future prices for the relevant minerals. Development projects
have no operating history upon which to base estimates of future cash
flows. The capital expenditures and time required to develop new mines
or other projects are considerable, and changes in costs or
construction schedules can affect project economics. Actual costs and
economic returns may differ materially from IAMGOLD's estimates or
IAMGOLD could fail to obtain the governmental approvals necessary for
the operation of a project; in either case, the project may not
proceed, either on its original timing or at all.
For a more comprehensive discussion of the risks faced by the Company,
and which may cause the actual financial results, performance or
achievements of IAMGOLD to be materially different from the company's
estimated future results, performance or achievements expressed or
implied by forward-looking information or forward-looking statements,
please refer to the Company's latest Annual Information Form, filed
with Canadian securities regulatory authorities at www.sedar.com, and filed under Form 40-F with the United States Securities Exchange
Commission at www.sec.gov/edgar.html. The risks described in the Annual Information Form (filed and viewable
on www.sedar.com and www.sec.gov/edgar.html, and available upon request from the Company) are hereby incorporated
by reference into this news release.
The Company disclaims any intention or obligation to update or revise
any forward-looking statements whether as a result of new information,
future events or otherwise except as required by applicable law.
About IAMGOLD
IAMGOLD (www.iamgold.com) is a mid-tier mining company with five operating gold mines (including
current joint ventures) on three continents and one of the world's top
three niobium mines. A solid base of strategic assets in Canada, South
America and Africa is complemented by development and exploration
projects and continued assessment of accretive acquisition
opportunities. IAMGOLD is in a strong financial position with extensive
management and operational expertise.
Please note:
This entire news release may be accessed via fax, e-mail, IAMGOLD's
website at www.iamgold.com and through CNW Group's website at www.newswire.ca. All material information on IAMGOLD can be found at www.sedar.com or at www.sec.gov.
Si vous désirez obtenir la version française de ce communiqué, veuillez
consulter le http://www.iamgold.com/French/Home/default.aspx.
SOURCE IAMGOLD Corporation